Avaliação dos critérios de projeto para estruturas de acostagem de navios: Estudo de caso aplicado ao terminal portuário público de Itajaí - SC

DSpace Repository

A- A A+

Avaliação dos critérios de projeto para estruturas de acostagem de navios: Estudo de caso aplicado ao terminal portuário público de Itajaí - SC

Show simple item record

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Nierwinski, Helena Paula
dc.contributor.author Podda, Leandro
dc.date.accessioned 2019-07-11T13:51:54Z
dc.date.available 2019-07-11T13:51:54Z
dc.date.issued 2019-06-27
dc.identifier.uri https://repositorio.ufsc.br/handle/123456789/197443
dc.description TCC (graduação) - Universidade Federal de Santa Catarina. Campus Joinville. Engenharia Civil de Infraestrutura. pt_BR
dc.description.abstract O Complexo Portuário de Itajaí está estrategicamente localizado em um dos principais entroncamentos rodoviários do Sul do Brasil, próximo a grandes rodovias como a BR 101 e BR 470. Sua posição geográfica coloca o Complexo no centro da Região Sul, englobando em um raio de 600 quilômetros, as capitais de Santa Catarina, Rio Grande do Sul, Paraná e São Paulo, tornando a região que movimenta aproximadamente 46% do PIB nacional. Tais características transformam o Complexo em um centro concentrador e distribuidor de cargas, favorecendo o Porto de Itajaí como um dos maiores portos de movimentação de contêineres do Brasil. Buscouse neste trabalho avaliar os critérios de projeto utilizados para as estruturas de atracação, esforços de amarração e esforços nas defensas gerados pelas embarcações de projeto utilizadas no dimensionamento da reconstrução dos Berços 3 e 4 do Terminal Portuário Público de Itajaí – SC. Avalia-se neste trabalho o fator meio ambiente, amarração, atracação e o terreno conforme a norma NBR 9782:1987 - Ações em estruturas portuárias, marítimas ou fluviais para as estruturas de ambos os berços considerando também recomendações nacionais de obras portuárias. Os resultados obtidos foram comparados com aqueles efetivamente utilizados no projeto da estrutura e, com base nos resultados, verificou-se que o esforço de atracação foi 14% superior para a embarcação menor e 43,35% inferior para embarcação maior. Quanto aos esforços de amarração a norma brasileira foi mais conservadora comparada aos resultados dos memorias de cálculo. pt_BR
dc.description.abstract Itajaí port complex is strategically located between the main roads of the south of Brazil, close to the major highways such as BR 101 and BR 470. Its geographic position places the complex in the center of the southern region, encompassing a radius of 600 kilometers of the capitals Santa Catarina, Rio Grande do Sul, Paraná and São Paulo, a region that generates approximately 46% of the Brazilian GDP. These characteristics allows the complex to become a freight hub and distributor, favoring the port of Itajaí as one of the largest ports of container shipping in Brazil. The objective of this work was to evaluate the criteria of the docking structure project for the docking structures, mooring efforts and berthing in the group generated by the design vessels used in the dimensioning of the reconstruction of Cribs 3 and 4 of the terminal public port of Itajaí-SC. This final paper evaluates environmental factors, mooring, berthing and the land according to the norm NBR 9782 - Actions in the port, maritime or fluvial structures, for the structures as cribs considering as well national recommendations for port works. The results obtained were compared with those used in the design of the structure and, based on the results, it was found that the mooring effort was 14% higher for the smaller vessel and 43.35% lower for larger vessel. As for the mooring efforts the Brazilian standard was more conservative compared to the results of the calculation reports. pt_BR
dc.format.extent 157 pt_BR
dc.language.iso pt_BR pt_BR
dc.publisher Joinville, SC pt_BR
dc.rights Open Access
dc.subject Obras portuárias pt_BR
dc.subject Parâmetros de projeto pt_BR
dc.subject Esforços amarração pt_BR
dc.subject Estruturas de atracação pt_BR
dc.title Avaliação dos critérios de projeto para estruturas de acostagem de navios: Estudo de caso aplicado ao terminal portuário público de Itajaí - SC pt_BR
dc.type TCCgrad pt_BR


Files in this item

Files Size Format View Description
TCC_LEANDRO_POD ... _UFSC_JOINVILLE_2019.1.pdf 12.94Mb PDF View/Open TCC_LEANDRO_PODDA_ENG_CIVIL_DE_INFRAESTRUTURA_UFSC_JOINVILLE_2019.1

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account

Statistics

Compartilhar