Avaliação da relação entre custos de material e recursos humanos nas etapas de empreendimento imobiliário residencial: estudo de caso

Repositório institucional da UFSC

A- A A+

Avaliação da relação entre custos de material e recursos humanos nas etapas de empreendimento imobiliário residencial: estudo de caso

Mostrar registro simples

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Jungles, Antonio Edesio pt_BR
dc.contributor.author Silva, Valsonir Alves da pt_BR
dc.date.accessioned 2012-10-24T23:07:25Z
dc.date.available 2012-10-24T23:07:25Z
dc.date.issued 2012-10-24T23:07:25Z
dc.identifier.other 279818 pt_BR
dc.identifier.uri http://repositorio.ufsc.br/xmlui/handle/123456789/93488
dc.description Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico, Programa de Pós-Graduação em Engenharia Civil, Florianópolis, 2010 pt_BR
dc.description.abstract A presente dissertação caracteriza-se como um estudo de caso. Um empreendimento imobiliário residencial composto de oito andares e uma cobertura é o objeto de estudo, denominado neste trabalho como Empreendimento X, desenvolvido e construído por uma empresa localizada na região da Grande Florianópolis com as seguintes características: empreendimento imobiliário residencial é composto de três torres, com oito andares e a cobertura cada uma. Cada Torre apresenta uma área de quatro mil trezentos e cinquenta e seis metros quadrados (4.356 m2). Cada andar é composto de seis apartamentos, com área aproximada de sessenta e cinco metros quadrados (65 m2). Trata-se de uma abordagem real, com objetivo principal de estudar a relação entre custos de material e de recursos humanos nas etapas de construção. Todas as etapas da obra, desde a sua implantação até a entrega, bem como, as apropriações de custos e o relacionamento por meio de percentuais relacionados ao CUB. As análises financeiras resultantes estão apresentadas sob a forma de gráficos e tabelas. Estas etapas correspondem a Serviços Preliminares, Infraestrutura, Supraestrutura, Alvenaria, Instalações Hidrosanitárias, Instalações de Proteção e Combate a Incêndio, Instalações Elétricas, Instalações de Gás, Instalações de Elevador, Instalações de Antena coletiva/ TV/ Telefone/ Interfone, Esquadrias, Esquadrias de Madeira, Esquadrias de Alumínio, Esquadrias de Ferro, Revestimento Externo, Revestimento Interno, Pavimentação, Impermeabilização, Pinturas, Elementos Decorativos e Serviços Complementares. O custo total do empreendimento foi de 2637,04 CUBs, que pode ser considerado de baixo custo dentro da expectativa de mercado. Em função das especificações do projeto, este poderá servir de base para construtores que venham conceber um empreendimento com as mesmas características do aqui apresentado. pt_BR
dc.description.abstract The present essay is about a case study. A residential real estate development composed of eight floors and a top floor is the object of study, named in the present work as X Development, developed and built by a company seated in Florianópolis with the following characteristics: residential real estate are composed of three towers, with eight floors each one and the roof. Each tower has an area of four thousand three hundred and fifty-six square meter (4.356 m²). Each floor is composed of six apartments, with an area of approximately sixty-five square meter (65 m2). It is a real approach, and its focus is to study the relation between material and labour costs and human resources in the stages of construction. All the construction stages, from its implement to delivery, as well as appropriations of cost and its relation whith the percentage by CUB. The resulting financial analysis are presented as graphs and tables. These stages represent the Preliminary Services, the Infrastructure, the Suprastructure, Masonry, Hydro-Sanitary Installations, Fire Protection and Fire Fighting Installations, Electrical Installations, Gas Installations, Lift Installations, Collective Antenna Installations for TV/ Telephone/ Interphone, Frames, Wooden Frames, Aluminium Frames, Iron Frames, External Coating, Internal Coating, Paving, Waterproofing, Painting, Decoration Elements and Complementary Services. The total cost of the development was 2637,04 CUBs, which can be considered as low costs, due to the design specifications, serving as basis for other constructors who come to conceive an undertaking with the same characteristics of the one here presented. en
dc.format.extent 49 p.| il., tabs., grafs. pt_BR
dc.language.iso por pt_BR
dc.subject.classification Engenharia civil pt_BR
dc.subject.classification Construção civil pt_BR
dc.subject.classification Custos pt_BR
dc.subject.classification Florianopolis (SC) pt_BR
dc.subject.classification Materiais de construção pt_BR
dc.subject.classification Custos pt_BR
dc.subject.classification Mao-de-obra pt_BR
dc.subject.classification Custos pt_BR
dc.title Avaliação da relação entre custos de material e recursos humanos nas etapas de empreendimento imobiliário residencial: estudo de caso pt_BR
dc.type Dissertação (Mestrado) pt_BR


Arquivos deste item

Arquivos Tamanho Formato Visualização
279818.pdf 10.58Mb PDF Thumbnail

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples

Buscar DSpace


Busca avançada

Navegar

Minha conta

Estatística

Compartilhar