Avaliação de riscos em pequenas centrais hidrelétricas

DSpace Repository

A- A A+

Avaliação de riscos em pequenas centrais hidrelétricas

Show simple item record

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Gómez, Luis Alberto
dc.contributor.author Otani, Melissa Yukari Ishizu
dc.date.accessioned 2017-07-10T19:24:34Z
dc.date.available 2017-07-10T19:24:34Z
dc.date.issued 2017-06-27
dc.identifier.uri https://repositorio.ufsc.br/xmlui/handle/123456789/177306
dc.description TCC (graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia Civil. pt_BR
dc.description.abstract Riscos e incertezas são aspectos intrínsecos a empreendimentos, cuja análise é imprescindível para a garantia do bom desempenho do projeto. O processo de avaliação de riscos proporciona um entendimento aprimorado dos itens que poderiam afetar o alcance dos objetivos estipulados, além de fornecer subsídios para o processo de tomada de decisões. Devido às crescentes exigências em termos de prazo, custo e qualidade, torna-se indispensável a realização de estudos e planejamento que possam avaliar, prever e reduzir as ameaças do empreendimento. Neste contexto, este trabalho tem por finalidade identificar e analisar os riscos associados à construção de uma Pequena Central Hidrelétrica, localizada no município de Varginha, MG. A partir de entrevistas, foram identificados 134 itens de risco ao empreendimento. Esses itens foram posteriormente avaliados nos parâmetros de probabilidade e impacto através do Método de Delphi, e classificados em riscos baixos, moderados e intoleráveis. Da lista inicial, 20 itens foram considerados intoleráveis, para os quais foi elaborado um plano de respostas baseado nos parâmetros sugeridos pelo PMI. pt_BR
dc.description.abstract Risks and uncertainties are aspects intrinsic to enterprises, which analysis is essential to guarantee the good performance of the project. The risk assessment process provides an improved understanding of the items that could affect the achievement of the stated objectives, besides providing subsidies for the decision-making process. Due to the increasing demands in terms of time, cost and quality, it becomes essential to carry out studies and planning that can evaluate, predict and reduce the threats of the enterprise. In this context, this work aims to identify and analyze the risks associated with the construction of a Small Hydropower Plant, located in the city of Varginha, MG. Based on interviews, 134 items of risk to the enterprise were identified. These items were later evaluated in the parameters of probability and impact using the Delphi Method, and classified as low, moderate and intolerable risks. From the initial list, 20 items were considered intolerable, for which a response plan was developed based on the parameters suggested by the PMI. pt_BR
dc.format.extent 176 f. pt_BR
dc.language.iso por pt_BR
dc.publisher Florianópolis, SC pt_BR
dc.subject Engenharia Civil pt_BR
dc.subject Identificação de riscos pt_BR
dc.subject Avaliação de riscos pt_BR
dc.subject Método de Delphi pt_BR
dc.subject Pequenas Centrais Hidrelétricas pt_BR
dc.title Avaliação de riscos em pequenas centrais hidrelétricas pt_BR
dc.type TCCgrad pt_BR


Files in this item

Files Size Format View
TCC_Melissa_Yukari_Ishizu_Otani.pdf 2.847Mb PDF View/Open

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account

Statistics

Compartilhar