dc.description |
TCC (graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia Civil. |
pt_BR |
dc.description.abstract |
A engenharia civil é composta de algumas grandes áreas, com diversas ramificações, onde o
profissional graduado pode atuar. Uma delas é retratada neste trabalho de conclusão de curso,
a construção civil, através do as built. Ele exerce um papel essencial na construção civil, pois
por meio dele é possível garantir o registro das informações da obra para as futuras alterações
que uma edificação pode estar sujeita ao longo de sua vida útil. Com isso, permitindo reformas
e outras modificações, além de conferir a qualidade da obra concluída. A tecnologia evoluiu
muito ao longo dos anos e, com ela, novas técnicas e métodos de levantamento e produção de
projetos as built foram desenvolvidas, com o apoio de inovações tecnológicas, como exemplo,
o método de modelagem BIM sobre nuvem de pontos, levantada com o equipamento laser
scanner. Este trabalho tem como objetivo comparar os métodos as built tradicional, com trena
laser e trena convencional, e as built “inovador” com modelagem BIM sobre nuvem de pontos,
com dados oriundos de um laser scanner. Para isso, adotou-se um caso para estudo em um
centro de educação infantil da cidade de Palhoça/SC, no qual os procedimentos da pesquisa
foram realizados durante o segundo semestre de 2019. Foram realizadas medições in loco,
usando o método tradicional e o método inovador, a fim de comparar, nos âmbitos da
produtividade, da precisão e dos custos, as etapas de levantamento de dados e modelagem da
informação. Os resultados demonstram que, ao comparar ambas as etapas, para a etapa de
levantamento de dados, o laser scanner provou-se levar 79% menos tempo e com uma precisão
maior quando comparada com o método tradicional, aliado a um acréscimo no custo de 57%.
A etapa de modelagem BIM, necessitou 93% mais tempo sobre a nuvem de pontos, teve uma
melhor precisão das informações, entretanto obteve um custo 78% maior em relação ao método
tradicional. Ao final, foi possível concluir que o método inovador aplicado a este caso de estudo,
apesar de mais custoso, pode ajudar os profissionais da área de construção civil a ganhar uma
melhora no tempo de levantamento, com uma maior precisão dos dados e da modelagem em
seus as builts. |
pt_BR |
dc.description.abstract |
Civil engineering is composed of some large areas, with several branches, in which the engineer
can act . One of them is portrayed in this work, the civil construction. The as built design
produced plays an essential role in civil construction, as it is possible to check the final quality
of the completed work, as well as to guarantee the record of the changes that a building
undergoes during its lifetime, allowing for refurbishments and other modifications.
Nervertheless, technology has evolved a lot over the years and, with it, new techniques and
methods for as built have been developed. As examples, we can mention the BIM modeling
method on point cloud, gathered using the laser scanner equipment. This work has the objective
to compare the as built traditional methods, with laser metric tape and conventional metric tape,
and the “innovative” built methods with BIM modeling over point cloud, with data resulting
from a laser scanner equipment. For this, a study case was defined, a child education center in
the city of Palhoça/SC. The research procedures were carried out during the second semester
of 2019. Measurements were made in loco, using the traditional method and the innovative
method, considering for both, the aspects of productivity, precision and costs for the stages of
data collection and information modeling. The results show that, for the data collection stage,
the laser scanner proved to be 79% more productive and with greater precision when compared
to the traditional method, combined with an increase in the cost of 57%. The BIM modeling
step, required 93% more time with the point cloud, had better accuracy and obtained a cost 58%
lower than the traditional method. In the end, it was possible to conclude that the innovative
method applied to this study case, although more expensive during the field work stage, can
help professionals in the civil construction area to gain an increase their productivity in the field
and their data accuracy and modeling in the as built designs. |
pt_BR |
dc.format.extent |
96 |
pt_BR |
dc.language.iso |
pt_BR |
pt_BR |
dc.publisher |
Florianópolis, SC |
pt_BR |
dc.rights |
Open Access |
|
dc.subject |
As Built |
pt_BR |
dc.subject |
Laser Scanner |
pt_BR |
dc.subject |
BIM |
pt_BR |
dc.title |
Comparação entre os métodos as built tradicional e com modelagem BIM sobre nuvem de pontos |