Execução da Superfície de Rolamento da Ponte Hercílio Luz

DSpace Repository

A- A A+

Execução da Superfície de Rolamento da Ponte Hercílio Luz

Show simple item record

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Haito, Ricardo Juan José Oviedo
dc.contributor.author Campos Lobo, Victoria Prudencio de
dc.date.accessioned 2019-12-12T19:09:10Z
dc.date.available 2019-12-12T19:09:10Z
dc.date.issued 2019-11-25
dc.identifier.uri https://repositorio.ufsc.br/handle/123456789/202848
dc.description TCC (graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia Civil. pt_BR
dc.description.abstract A Ponte Hercílio Luz, localizada em Florianópolis, apresenta um grande valor histórico: é atualmente a única ponte pênsil do mundo sustentada por barras de olhal e, por esse motivo, foi tombada pelo Patrimônio Histórico de Santa Catarina. Na revitalização da Ponte Hercílio Luz, muitos elementos foram substituídos, desde as barras de olhal, até os rebites, os cabos pendurais e a superfície de rolamento. Para tal superfície, optou-se pela utilização de gradis metálicos; método pouco frequente em pontes brasileiras. O objetivo deste trabalho é descrever a execução da superfície de rolamento da Ponte Hercílio Luz com gradis metálicos. Para tanto, foi realizada uma pesquisa qualitativa a partir de dados mediante observação em campo, entrevistas e análise da documentação da obra. Dentre outras, foram incluídas as documentações dos procedimentos de recebimento, armazenamento e transporte e instalação dos gradis. Dentre os resultados dos estudos, destacam-se: a) a descrição do produto, que inclui aspectos do projeto dos gradis e da sua paginação; b) a descrição da sequência detalhada das atividades em seis etapas: recebimento das peças, armazenamento, transporte, pré-montagem, montagem e liberação. Dada a singularidade na instalação deste tipo de superfície de rolamento, a descrição detalhada dos seus componentes e a forma de instalação compreendem informações relevantes para os tomadores de decisão replicarem a sua escolha em outras pontes do país. A principal contribuição deste trabalho consiste na apresentação estruturada de detalhes de execução da obra que formam parte do conhecimento técnico dos diferentes profissionais que participaram da execução dos gradis metálicos. pt_BR
dc.description.abstract The Hercílio Luz Bridge, located in Florianopolis, has a big historical value: it is, nowadays, the only suspension bridge which is suspended by eyebars – fact that keeps it into the Historical Heritage of Santa Catarina. On the Hercílio Luz Bridge revitalization, many elements were replaced, such as the eyebars, the rivets, the supporting cables and the rolling surface. Metallic grids were used for the rolling surface on the Hercílio Luz revitalization, an uncommon method on the Brazilian bridges. The main purpose of this work is to describe the executive procedure of Hercílio Luz Bridge’s rolling surface. For that, a qualitative research was made under the data that came from local observation, interviews and the documentation from the construction work. It was included information as the receiving proceeding documentation, storage, transportation and metallic grids installation. Among the results, the following stand out: a) the product description, including the grids project aspects and its layout; b) the detailed activity order description in six steps: parts receiving, storage, transportation, pre-assembly, assembly and traffic release. In behalf of the singularity of the proceeding of this type of rolling surface, the detailed description of its components and its installation procedure are relevant information for the decision-makers to reply their choice in other bridges around the country. The main contribution of this work consists in the structured presentation of the details from the work execution that sums up the technical knowledge of the many professionals that worked on the metallic grid executive procedure. pt_BR
dc.language.iso pt_BR pt_BR
dc.publisher Florianópolis, SC pt_BR
dc.rights Open Access
dc.subject Ponte Hercílio Luz pt_BR
dc.subject Gradis Metálicos pt_BR
dc.subject Procedimento Executivo pt_BR
dc.subject Reabilitação pt_BR
dc.title Execução da Superfície de Rolamento da Ponte Hercílio Luz pt_BR
dc.type TCCgrad pt_BR


Files in this item

Files Size Format View Description
TCC_Victoria_Lo ... dis_Metalicos_assinado.pdf 7.522Mb PDF View/Open TCC

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account

Statistics

Compartilhar