Proposição de um sistema de planejamento e controle da produção através do uso do índice de valor agregado na construção de um edifício multifamiliar

DSpace Repository

A- A A+

Proposição de um sistema de planejamento e controle da produção através do uso do índice de valor agregado na construção de um edifício multifamiliar

Show simple item record

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Marchiori, Fernanda Fernandes
dc.contributor.author Carlessi, Natália
dc.date.accessioned 2018-12-10T13:09:07Z
dc.date.available 2018-12-10T13:09:07Z
dc.date.issued 2018-11-22
dc.identifier.uri https://repositorio.ufsc.br/handle/123456789/192194
dc.description TCC (graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia Civil. pt_BR
dc.description.abstract Este trabalho de conclusão de curso tem por objetivo a proposição de um sistema de controle do planejamento do custo e do prazo em uma obra residencial multifamiliar por meio do uso do índice de Valor Agregado. O método de pesquisa adotado foi o estudo de caso, realizado em uma empresa de médio porte e em um empreendimento que se encontra em fase de acabamento e possui mais de 12.000 metros quadrados de área construída, composto por 1 torre de 13 pavimentos. Durante o trabalho foi desenvolvida uma EAP para o projeto, um orçamento com custos diretos relacionados a obra e, por fim, a programação da obra com os custos distribuídos nas atividades, com o intuito de aplicar o método do valor agregado para controle da produção. Com a realização deste trabalho, foi possível realizar a comparação entre as atividades planejadas e as realizadas, determinar o motivo dos atrasos e adiantamentos das atividades durante seis semanas, além disso, foi possível determinar a variação de custo das atividades de reboco massa única durante a sexta semana. pt_BR
dc.description.abstract The present work has as main objective to propose a system of production planning and control of cost and time in a medium-standard residential building with the use of the Earned Value analysis. The research method adopted was a case-study, which was conducted in a medium-size company with a building that is in its finishing stages and has more than twelve- thousand square meters of built area. This building is composed of one tower with 13 floors. The following were developed in this paper: a WBS of the project, a budget for the construction with direct costs and a project plan with costs attributed to each activity, aiming to apply the Earned Value analysis for project control. With the completion of this work, it was possible to compare the planned activities with the executed ones, to identify and account for the reasons for delays and advances of the activities during six weeks. In the sixth week, the variance of cost for cement rendering activities was also determined. pt_BR
dc.format.extent 145 pág. pt_BR
dc.language.iso por pt_BR
dc.publisher Florianópolis, SC pt_BR
dc.subject Planejamento de obras pt_BR
dc.subject Controle de obras pt_BR
dc.subject Método do Valor Agregado pt_BR
dc.title Proposição de um sistema de planejamento e controle da produção através do uso do índice de valor agregado na construção de um edifício multifamiliar pt_BR
dc.type TCCgrad pt_BR


Files in this item

Files Size Format View
TCC Natália Carlessi.pdf 8.619Mb PDF View/Open