Sistema pré-moldado de concreto: estudo de caso na Universidade Federal de Santa Catarina

DSpace Repository

A- A A+

Sistema pré-moldado de concreto: estudo de caso na Universidade Federal de Santa Catarina

Show simple item record

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Repette, Wellington Longuini
dc.contributor.author Cunha, Brunela Francine da
dc.date.accessioned 2016-12-09T20:22:52Z
dc.date.available 2016-12-09T20:22:52Z
dc.date.issued 2016-12-09
dc.identifier.uri https://repositorio.ufsc.br/xmlui/handle/123456789/171379
dc.description TCC (graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia Civil. pt_BR
dc.description.abstract O sistema pré-moldado de concreto apresenta-se como uma forma de se otimizar os processos utilizados na construção civil e aumentar o nível de qualidade das obras. Entretanto, edificações realizadas com esse sistema construtivo na Universidade Federal de Santa Catarina (UFSC) vêm apresentado problemas ainda em seus primeiros anos de utilização. Em vista disso, este estudo tem como objetivo identificar e analisar os problemas existentes no prédio Espaço Físico Integrado (EFI), construído com o sistema pré-moldado de concreto na UFSC, além de apresentar sugestões de melhorias que possam minimizar, ou mesmo, evitar os problemas encontrados. Ademais, verificou-se de que forma as condições impostas pelo processo licitatório realizado na UFSC influenciam no surgimento dos problemas identificados. A coleta de dados foi realizada a partir de visitas técnicas ao prédio EFI, conversas com os gestores da edificação e com o diretor do Departamento de Fiscalização de Obras (DFO) da UFSC e análise de documentos técnicos, como memoriais de especificações, projetos complementares, arquitetônico e estrutural, fornecidos pelo DFO. Os principais problemas encontrados foram: falhas no projeto e execução das vedações das janelas e das ligações entre placas pré-moldadas, ocasionando infiltrações no edifício; projetos com nível de detalhamento insuficiente; problemas de logística das peças pré-moldadas, em consequência da distância entre a fábrica e a obra e devido à necessidade de grande área para armazenamento das peças; oxidação de dispositivos metálicos em razão da falta de proteção anticorrosiva; e incompatibilidade entre projetos. Portanto, sugere-se que os métodos e técnicas utilizados para a construção de edifícios em concreto pré-moldado na UFSC sejam revisados, de modo a evitar que os problemas citados ocorram novamente e, assim, aumentar o nível de qualidade das edificações construídas na Universidade. pt_BR
dc.description.abstract Precast concrete system presents as a way of developing technologically and increasing the quality of construction sites. However, precast concrete buildings at the Federal University of Santa Catarina (UFSC) have presented problems during their first years of use. The objective of this study is to identify and analyze the problems in the building Espaço Físico Integrado (EFI), built in precast concrete at UFSC, and to present suggestions of improvements which minimize or avoid these problems. In addition, the researcher verified how the conditions imposed by the bidding process carried out at UFSC influence the emergence of the problems identified. Data collection was based on technical visits to the EFI, conversations with building managers and with the director of the Department of Construction Supervision (Departamento de Fiscalização de Obras - DFO) of UFSC and analysis of technical documents such as specifications reports, complementary, architectural and structural projects, provided by the DFO. The main problems in the building are: design and execution failures of the window and connections between precast panels seals, causing infiltration in the building; projects with insufficient detail; precast concrete parts logistics issues, as a consequence of the distance between the factory and the construction site and due to the necessity of large area for the storage; oxidation of metal devices due to the lack of corrosion protection; and incompatibility between projects. Therefore, methods and techniques used for the construction of precast concrete buildings at UFSC should be revised, in order to avoid the problems mentioned and to increase the quality of the buildings constructed in the University. pt_BR
dc.format.extent 108 f. pt_BR
dc.language.iso por pt_BR
dc.publisher Florianópolis, SC pt_BR
dc.subject Sistema construtivo pt_BR
dc.subject Concreto pré-moldado pt_BR
dc.subject Problemas de desempenho pt_BR
dc.subject UFSC pt_BR
dc.title Sistema pré-moldado de concreto: estudo de caso na Universidade Federal de Santa Catarina pt_BR
dc.type TCCgrad pt_BR


Files in this item

Files Size Format View
TCC - Brunela - Versão final.pdf 4.833Mb PDF View/Open

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account

Statistics

Compartilhar